The work with the brakes takes a lot of time.I had to get some information about how the brakes are mounted according to the rear axle.I got some help with photos how the rear brakes are mounted.Next was the same problem with the hand brake installation with all the stays and clevis pin.I hope that I now have mounted it nearly correct next step there is to buy linnings.The engine work are just now waiting for the worm gear that is mounted on the water pump axle that drives the oil pump which is connected via a worm gear to the ignition.Sounds simple!?I have also mounted old tires three of them I do not have the last tire -hope to find some.The bolts for the oilpan are now cleaned and ready to be mounted.
Paint and engine
Pistons and spiral gear
The work is progressing with the pistons.The next step is the camshaft and the valves.The handbrake is the next to figure out how it works and how it is mounted on the gearbox.The water pump axel that has an spiral gear that drives the oilpump and the ignition have I perhaps found.If not I have a contact that can make one.
I wish all A Happy New Year !
Paint and engine
The painting of the body is progressing.The right dimensions of the pistons has arrived and also mounted.The front axle and the rear axle are now mounted .I have also test to mount one tire to see how it fits to the wheel..The front axle has new grease fittings been mounted.The steering had one of the ends on the front cross tube been worn out new ones were made there.
Engine and troubles
The engine work has stopped because of wrong compression height on the pistons.I have found new nos cast iron but it is drilled for aluminum pistons. The searching has just begun.The painting has just come to the hood in blue.More part are also painted such as the drive gear,oilpump,wheel column and front axle parts.The radiator has been tested but has some minor leaks but the bottom tank has got a big leak.The radiator shell are nickel plated and the outside handles are now in the plaiting shop.The brake cross shaft are a new one made and just fitted in place.The wood floor has been fitted in place and wood plugged in place.
Rearaxel and engine
The rear axle has got a layer of paint and the Columbia text has been painted white.The universal joints both front and rear has been put togheter.The engine the aluminum part of it with the crankshaft bearing being in the right measures ready for the connecting rods.The cylinder block and the aluminum block are bolted together .The fenders are now painted ready for mounting in place.
Frontseat and engine
The year 2012 begun with more plastic filling and finishing job before painting.The front seat is also repaired and new side plates has been done.
The engine has arrived from the shop that made new babbits both for the sleeves and crankshaft bearings.There is more to do there before it is ok in tolerance.
I have test mounted the engine to see how it looks.
The doors got two new inside handles .
Fenders and enginebolts
After 2 years of work
Showing some of the works done under one year.
Se video play list !